6960th
CLG, 1950s
(Source:
Günter
Oswald)
The swim bridge
at the crossing site near RHEINHAUSEN under maintenance.
The pontoons of the swing bridge section are brought on
land (utilizing a special slip designed by Mr. Oswald) and
sand blasted and spray painted. Sometime later, the pontoons
of the swim bridge and the heavy rafts were transported
to a German shipyard for general overhaul.
|